Render Calculator UK
Last updated:
Calculate how many bags of render you need for your project. Add multiple walls, deduct windows and doors, and choose your render type to get a bag count and weight estimate.
Enter wall details
Typical: 15-20mm for 2-coat external, 10-15mm for monocouche
Covers cuts, breakages and uneven ground. 10% is a typical starting point.
Render estimate
Enter at least one wall with length and height to see your estimate
Example result
An 8m × 2.5m external wall with two 1.2m × 1.2m windows, 15mm of sand:cement render and 15% wastage.
| Net area | 17.12 m² |
|---|---|
| Render with wastage | 561kg |
| 25kg bags | 23 |
Figures this calculator uses
| Sand:cement (external) | 1.9 kg per m² per mm |
|---|---|
| Sand:cement (internal) | 1.75 kg per m² per mm |
| Monocouche | 1.5 kg per m² per mm |
| Pre-mixed bagged render | 1.7 kg per m² per mm |
| Default wastage | 15% |
Sources: Coverage rates are typical manufacturer figures. Coat thicknesses follow common practice for two-coat external render (see BS EN 13914-1). All figures are planning estimates. Check your supplier's product data before ordering.
How to calculate how much render you need
The calculation works in three steps: measure the gross wall area (length x height for each wall), deduct the area of windows and doors, then multiply the net area by the render thickness and density.
Coverage rates for render are typically quoted as kg per m2 per mm of thickness. Dividing total kg by bag size gives bag count. Always add wastage - render waste is significant on most projects due to mixing, over-ordering to avoid running short, and the messy nature of the work.
Render type coverage guide
| Render type | Thickness | Approx bags/m2 | Note |
|---|---|---|---|
| Sand:cement 2-coat (external) | 15-20mm | ~1.2-1.5 bags/m2 | Most common external system |
| Sand:cement 1-coat (internal) | 10-12mm | ~0.7-1.0 bags/m2 | Internal walls only |
| Monocouche | 12-15mm | ~1.0-1.2 bags/m2 | Through-colour, no painting needed |
| Pre-mixed bag render | Variable | Check product label | Varies significantly by brand |
Coverage rates are estimates. Always verify against your specific product data sheet before ordering.
Common rendering mistakes
- Applying too thick in one coat. Thick single coats sag and crack. Apply in two coats with adequate drying time between them.
- Not soaking the substrate. Dry brick or block will suck moisture from the render too fast, preventing proper hydration. Dampen the wall before applying.
- Rendering in direct sunlight or frost. Rapid drying and freezing both damage fresh render. Cover with breathable hessian or polythene to protect in extreme conditions.
- Skimping on wastage. Running out of render mid-wall is a common and frustrating problem. Order at least 15% extra - it is always better to have a bag left over than to need one more.
Rendering guides
- How to render a wall - mixes, coats and curing step by step
- External render types - sand and cement, monocouche, silicone and lime
- How long does render take to dry? - times between coats and before painting
Related calculators
Calculate cement bags and sand for brickwork and blockwork. Adjustable mix ratios.
Work out how many sheets of plasterboard you need for walls and ceilings.
Work out how much concrete you need for a garage base, garden room or any concrete slab.
Calculate aggregate quantities by type - ballast, sharp sand, MOT Type 1 and more.
Frequently asked questions
How many bags of render do I need per m2?
For traditional sand:cement external render at 15mm total thickness, expect approximately 28.5 kg per m2 (15mm x 1.9 kg per m2 per mm). That is just over 1 x 25kg bag per m2. Add 15% wastage, so budget around 1.2-1.3 bags per m2. Coverage varies by product - always check the data sheet.
What thickness should external render be?
Traditional two-coat external render is typically 12-20mm total - a scratch coat of 10-12mm followed by a finish coat of 5-8mm. Monocouche (single-coat) render is applied at 10-15mm. Single-coat sand:cement is only suitable for small repairs. Thicker renders are more prone to cracking unless applied in stages.
How long does render take to dry?
Sand:cement render typically takes 24-48 hours per coat to be firm enough for overcoating, and several weeks to reach full strength. Do not paint render for at least 4-6 weeks (some manufacturers recommend longer). In cold or damp conditions, cover with breathable sheeting to slow drying. Monocouche render can be painted after 28 days.
Can I render over old render?
Only if the old render is completely sound, well bonded and free of cracks. Hack off any hollow areas first. New render applied over failing old render will fail with it. On a flat, sound existing render, you can apply a finishing coat - but the total thickness must remain within manufacturers limits.
What is the difference between monocouche and sand:cement render?
Sand:cement render is mixed on site (or from bagged materials) and typically applied in two coats. Monocouche (through-colour) render is a factory-mixed pre-coloured product applied in a single pass. Monocouche is more consistent in colour and finish, easier to apply, but more expensive per bag. It does not need painting.
Does render need a scratch coat?
For traditional two-coat work on masonry, yes - the scratch coat provides key for the finish coat. The scratch coat is raked (scratched) while still plastic to create a mechanical bond. Single-coat systems and monocouche products are designed to be applied directly to prepared masonry without a separate scratch coat.
Planning estimates only
These results are estimates for planning purposes only. Actual material quantities can vary based on site conditions, compaction, wastage, product size, installation method and supplier guidance. For structural, safety-critical or regulated work, always consult a qualified professional.