Aggregate Calculator

Sub Base Calculator UK

Last updated:

Work out how much sub-base material you need for patios, driveways and garden paths. Choose from MOT Type 1, hardcore, crushed concrete or crushed stone - with compaction factor applied automatically.

Enter dimensions

Enter the finished compacted depth

15% added

Covers cuts, breakages and uneven ground. 10% is a typical starting point.

%

Sub-base estimate

Enter dimensions to see estimate

Tonnes to order
Enter dimensions above

Example result

A 4m × 3m patio sub-base of MOT Type 1, 100mm compacted depth, with 15% wastage.

Area 12 m²
Compacted volume 1.2 m³
Tonnes to order 3.77 tonnes
Bulk bags (0.85 t) 5

Figures this calculator uses

MOT Type 1 2.1 t/m³, compaction factor 1.3
Hardcore (mixed) 2 t/m³, compaction factor 1.25
Crushed Concrete 1.95 t/m³, compaction factor 1.2
Crushed Stone 1.9 t/m³, compaction factor 1.25
Bulk bag weight 0.85 tonnes

Sources: Densities are typical bulk densities published by UK aggregate suppliers and builders' merchants. MOT Type 1 grading is defined in the Specification for Highway Works, Series 800 (Clause 803). All figures are planning estimates. Check your supplier's product data before ordering.

How to calculate sub-base quantities

The calculation is length × width × compacted depth, multiplied by a compaction factor to account for the difference between loose-tipped material and the final compacted layer. The result is converted to tonnes using the material density.

Entering your required compacted depth is important - this is the depth you need after compaction, not the depth of material you tip. Our calculator adds the compaction factor automatically based on the material you select.

Worked example - 4m × 3m patio at 100mm compacted

Compacted volume4.0 × 3.0 × 0.1 = 1.2 m³
× Compaction factor (1.3)1.2 × 1.3 = 1.56 m³
× Density (MOT Type 1, 2.1 t/m³)1.56 × 2.1 = 3.28 tonnes
+ 15% wastage3.28 × 1.15 = 3.77 tonnes
Bulk bags (0.85t)5 bulk bags

Frequently asked questions

How deep should a sub-base be for a patio?

For a standard domestic patio, 100mm of compacted sub-base is typical. On soft or poorly-draining ground, 150mm gives more stability. The sub-base should be compacted in layers - never try to compact more than 75–100mm in a single pass.

What is the best sub-base material for a patio?

MOT Type 1 (crushed limestone or granite) is generally regarded as the best and most consistent sub-base material for domestic patios. It compacts well, drains reasonably and is widely available. Hardcore is cheaper but more variable in quality and grading.

Do you need a sub-base under all patios?

For most outdoor patios, a compacted sub-base is strongly recommended. It prevents settlement, improves drainage and gives a stable platform. Skipping the sub-base often leads to slabs moving, cracking or becoming uneven within a few years.

What is the difference between compacted and loose depth?

When sub-base material is delivered, it arrives loose. Once you plate-compact it, it reduces in volume - typically by 20–30%. Our calculator accounts for this: you enter the compacted depth you need and we calculate how much loose material to order.

Can I use hardcore instead of MOT Type 1?

You can, but hardcore is more variable. It is mixed broken brick, concrete and stone of inconsistent sizes. MOT Type 1 is graded to a specification and compacts more predictably. For most domestic patios and driveways, MOT Type 1 is worth the modest extra cost.

What is the best sub-base material for a driveway?

MOT Type 1 is the most widely recommended sub-base material for driveways. It compacts well, is durable and is available from most builders merchants and aggregate suppliers.

How many tonnes of sub-base per m2?

At 100mm compacted depth, you need approximately 0.27 tonnes of MOT Type 1 per m2 (including the 1.3x compaction factor, before wastage). At 150mm, approximately 0.41 tonnes per m2. Add 15% wastage on top of these figures.

Planning estimates only

These results are estimates for planning purposes only. Actual material quantities can vary based on site conditions, compaction, wastage, product size, installation method and supplier guidance. For structural, safety-critical or regulated work, always consult a qualified professional.